Value-add means increasing the value of an existing property through active measures: reducing vacancy, moving rents towards market levels, cutting costs, refurbishing space or changing its use. Repositioning goes a step further and changes the property's role in the market, for example through a new use concept or a new target group. Both approaches only work if the cause of the current state is understood, the market supports the new positioning and costs, time and financing are planned realistically. An increase in value is never guaranteed.
Core, value-add, opportunistic
| Strategy | Starting point | Measures | Risk |
|---|---|---|---|
| core | stable letting, good location, good condition | hold and manage | lower |
| value-add | improvement potential in letting, condition or costs | targeted measures | medium |
| opportunistic | major conversion, development, distress | fundamental change | higher |
The boundaries are fluid. What matters is an honest assessment of how much change is needed.
The main levers
1. Letting
- market vacant space in a targeted way
- improve the tenant mix, reduce dependency on individual tenants
- extend lease terms
- move rents towards market level within the legal framework
2. Operating costs
- reduce non-recoverable costs
- review service contracts
- reduce energy consumption
3. Refurbishment
- adapt space to current requirements
- renew building services
- upgrade common areas, entrances and outdoor spaces
4. Energy efficiency and ESG
Energy measures can reduce operating costs, improve lettability and affect financeability. At the same time, they are often capital intensive. Check subsidy programmes and regulatory requirements.
5. Change of use
For example from office to residential, from retail to mixed use or from commercial to logistics. Prerequisites are planning permission, technical feasibility and demand for the new use. See Real Estate Asset Classes Compared.
The business plan
A value-add project needs a written business plan:
- starting point: condition, letting, income, costs
- root cause analysis: why is the property the way it is today?
- target picture: use, target group, rents, occupancy
- measures with costs and timetable
- financing including buffer
- scenarios: base, cautious, stress
- exit or hold strategy
Calculation
| Item | Question |
|---|---|
| purchase price and costs | What is being paid? |
| capex budget | What do the measures cost, including contingency? |
| vacancy during execution | How long is income missing? |
| letting costs | agents, tenant incentives, fit-outs |
| financing costs | interest during construction |
| income after execution | realistic rents and occupancy |
| value after execution | based on realistic assumptions |
Frequently underestimated are the time to full occupancy and the cost of tenant fit-outs.
Execution
- use experienced project management
- clarify permits early
- plan works in let buildings with consideration for existing tenants
- start marketing in parallel with construction
- compare plan and actuals regularly
Financing
Value-add projects are often financed with a combination of senior debt, possibly mezzanine capital and equity. Lenders look at the sponsor's experience, the plausibility of the business plan and buffers. See Understanding Real Estate Financing.
Risks
- construction costs and time increase
- demand for the new concept is lower than expected
- permits are delayed
- interest rates and financing costs change
- market values develop differently than expected
Common mistakes
- cause of vacancy not understood
- rent assumptions too optimistic
- no buffers in budget and timetable
- marketing started too late
- financing without room for delays
Checklist
- root cause analysis documented
- market demand for the target picture checked
- measures with costs and timetable
- buffers in budget and time
- financing with headroom
- scenarios and exit options
- project management and responsibilities
If something is stuck with your property or portfolio, I can sort out the situation with you in real estate advisory, under NDA if you wish. See also: Distressed Real Estate.
A property where something is stuck?
Describe the situation, under NDA first if you wish. I sort out the options with you; you and your advisers conduct any negotiations.
Book an initial call Real Estate AdvisoryFAQ
What distinguishes value-add from development?
Value-add improves an existing property. Development creates new space or fundamentally changes the fabric and usually carries higher risk.
How long does a value-add project take?
That depends on scope, permits and market. Plan realistically and with buffers, particularly for the letting phase.
Is converting office to residential worthwhile?
Only if it is permitted under planning law, technically feasible and economically viable. This must be checked for each building individually.
How important are energy measures?
Increasingly important for lettability, operating costs and financing. At the same time they are capital intensive and should be part of the business plan.